## **Request for Proposal**
## **Design, Material Supply, Installation and Commissioning of LPG Storage and Dispensing System**
**Project Title:** Design, Material Supply, Installation, Testing and Commissioning of LPG Storage and Dispensing System at Eruwa
**RFP Reference:** ATF/RFP2026-01
**Procuring Entity:** AATF
**Location:** Eruwa, Nigeria
**Submission Deadline:** 3 July 2026, 15:00 (WAT)
**Mandatory Site Visit:** Yes
### 1. Invitation to Submit Proposal
AATF invites qualified and experienced individual/firm Engineering, Procurement and Construction contractors to submit technical and financial proposals for the design, supply, installation, testing and commissioning of an LPG storage and dispensing system at the AATF Eruwa Factory site. The successful contractor shall provide a complete, safe, compliant and operational system, including all installation materials, civil works, mechanical works, electrical works, instrumentation, approvals support, testing, commissioning, documentation and training.
### 2. Project Background and Objective
The project requires the establishment of an LPG storage and dispensing point of two aboveground LPG storage vessels of 5MT and 10MT capacity that AATF have already procured for installation, pumping and metering equipment, piping network, pressure regulation, safety systems, canopy, perimeter protection and associated civil and electrical works. The objective is to procure a turnkey solution delivered by one accountable contractor, from engineering design through commissioning and handover.
### 3. Required System Capacity (Components Vs Minimum Requirement)
- **Transfer system:** LPG pump, motor, bypass arrangement, flow meter, valves, strainers and fittings suitable for LPG service
- **Dispensing/user connection:** Complete piping, pressure regulation and metering arrangement to the designated user point.
- **Safety systems:** Pressure relief, emergency shutdown, excess flow protection, earthing, fire protection interface, signage and emergency response provisions.
- **Civil works:** Foundations, equipment plinths, drainage, canopy, fencing, access and protection works.
**4. Scope of Work**
- Conduct site verification and confirm final design basis
- Engineering design and site verification
- Supply of all installation materials
- Construction and installation works
- Testing, commissioning, and training
### 5. Technical Requirements
- Pump, flow meter and piping system
- Safety systems including ESD and earthing
- Civil infrastructure
- All works to comply with ASME, NFPA LPG standards, and Nigerian regulations.
### 6. Commercial Pricing Template (BoQ) ***(To be completed by bidder)***
The BoQ must provide a detailed cost breakdown inclusive of all applicable statutory taxes, duties, transport, installation, testing, commissioning, documentation and any other costs required to deliver a complete system (in terms of units, quantity, unit Rate and total amounts per BoQ line).
- Engineering & Design
- Civil Works & Foundations
- Piping & Valves
- Pump & Metering System
- Electrical & Instrumentation
- Installation & Commissioning
- Transportation & Logistics
- Training & Documentation
- Warranty & Maintenance
### 7. Installation and Commissioning Scope
- Mobilise competent personnel, tools, lifting equipment and safety controls.
- Confirm site readiness, working boundaries, permit-to-work requirements and safety controls.
- Install foundations, plinths, supports, canopy, fencing and drainage works.
- Position and secure LPG vessels in accordance with approved layout and safety distances.
- Install pumps, flow meter, valves, regulators, piping, instrumentation and electrical systems.
- Carry out welding, jointing, coating, earthing, bonding and equipment alignment.
- Perform pressure testing, leak testing, valve testing, emergency shutdown testing and functional checks.
- Commission the complete system under controlled conditions and demonstrate safe operation.
- Train operators on normal operation, emergency shutdown, isolation, inspection and basic maintenance.
- Submit commissioning report, test certificates, calibration certificates, manuals, warranties and as-built drawings.
### 8. Compliance Checklist
- Valid company registration and tax compliance documentation.
- Demonstrated experience in LPG storage, piping, dispensing or gas plant installation.
- Evidence of qualified mechanical, civil, electrical and safety personnel.
- System design aligned with applicable Nigerian regulatory requirements and recognised LPG safety codes.
- Preliminary site layout, general arrangement, process flow and piping drawings submitted
- Safety distances, hazardous area considerations and emergency access addressed.
- Fire protection, emergency shutdown, gas detection interface and safety signage included.
- Pressure testing, leak testing, commissioning and handover plan included.
- Warranty, after-sales support and spare parts availability stated
### **9.
Sign up free to get the apply link, save to pipeline, and set email alerts.
Sign up free →Professional Plan
7-day free trialUnlock the Opportunity Portal
You're browsing for free. Upgrade to Professional to get email alerts, application tracking and AI-powered CV matching.
$9.99 / month
- 🔔Email alerts for new matching jobs
- 📋Track applications in your dashboard
- 📄Upload CV for AI-powered matching
- 📌Save searches with one click
- 🌍Access to 10,000+ live vacancies